
We measure the yield and drawdown so the pump is sized to what the borehole can sustainably deliver, then install it.
A pump test runs the new borehole and measures how much water it yields and how far the water level draws down.
Those readings decide the pump. We size it to what the borehole can sustainably deliver and install it, so the borehole is not over-pumped.

Test pumping
We pump the borehole and record discharge over the test.
Yield and drawdown
Water levels are measured to find a sustainable rate.
Pump installation
The pump is sized from the test results and installed.



A survey is the first step. Share the location and what you need, and we will call you within one working day to arrange it. We quote after the survey.